Pricing

No estimators. No site visits to get a number.

Pick a delivery model, configure the footprint, see your total live. Every line item is on the page — labor, blocks, liner, equipment, add-ons.

Ship anywhere

DIY Kit

Starts at$6,800
$219/mo· financing via Affirm / Klarna

Precision-cut block layout, liner, cap stones, plumbing, and equipment kit — palletized and freighted to your driveway. Assemble in a weekend with a friend.

  • Full bill of materials, cut to spec
  • Liner, cap stones, skimmer & returns
  • Pump, filter, and plumbing kit
  • Step-by-step build manual + video
  • Email support during build
  • Excavation
  • Local permits
  • On-site labor
Configure a kit
FL only · 48-hour install

Florida Turnkey

Starts at$14,500
$468/mo· financing via Affirm / Klarna

We send a crew. Site prep, block-up, plumbing tie-in, equipment commissioning. You hand over the yard on Friday, swim on Sunday.

  • Everything in the DIY Kit
  • Local crew, site prep, install labor
  • Equipment commissioning + first fill
  • Coverage in Miami, Tampa, Orlando metros
  • 1-year workmanship warranty
Check your zip
Add-on to either tier

+ Architect Review

Starts at$149
$5/mo· financing via Affirm / Klarna

Florida-licensed architect reviews your design and issues a sealed PDF for HOA submittal or permit-edge projects. Three SLAs.

  • Standard 3–5 days — $149
  • Expedited Next morning — $249
  • Same-day By 6pm today — $349
  • Sealed PDF + HOA cover letter
  • One round of revisions included
Learn about the seal
Price objections

The questions we get most.

Why so much cheaper than a traditional pool?
Traditional in-ground gunite pools cost $60–120k because they require deep excavation, steel cage, gunite spray, tile work, decking, and 4–8 weeks of crew time. Our pools stay above-ground under 24" — no excavation, no gunite, no permit in most of Florida. Same water, a fraction of the steps.
What's NOT included in the price?
Site clearing if your yard isn't level, electrical run from your panel to the equipment pad (typically $300–800 from a local electrician), and a water bill for the first fill (~$40–80). HOA fees if your board requires them.
Do I pay everything upfront?
30% deposit to lock your build slot, 70% before the kit ships or the crew rolls. We do not charge for changes to your design until the deposit is paid.
Financing?
Yes — Affirm, Klarna, and Afterpay are available at checkout alongside card payment. Affirm covers our full pool range with 3–36 month installments; Klarna and Afterpay handle smaller add-ons. You'll see live monthly options when you reach the Stripe checkout page.
Refund policy?
Full refund of deposit any time before fabrication starts (typically 5 business days after order). After that, deposit is non-refundable but credits to a future build for 12 months.

Still have questions? Talk to a human →

Build your number.

Configure a pool and watch the bill of materials update live.

Open the configurator →